How does this work?
Send us your floor plan
Before designing the Tonon Meat Rail System, we need a floor plan that clearly shows the sizes of the receiving area, operation area, and cold room. Additionally, we will need to know:
- Whether you require a scale
- The number of hooks needed
2D Drawing
We will provide you with a 2D drawing based on the floor plan, which will look like this:
Once we receive your confirmation, production will take 4-6 weeks, and shipping will take an additional 4-8 weeks.
Installation
The TONON Meat Rail System is simple to assemble, typically requiring just two people to complete the construction of a small room in 1-2 days.